Power Industry SOLUTIONS

Application in petrochemical industry

Application of Kaiyan machinery inPower Industry

According to the "five prevention" specifications and technical requirements of electric power, the mechanical interlocking system is designed and equipped with electric five prevention mechanical lock. Each step of operation can be realized through key transmission to ensure that the electric equipment operates according to the preset safety procedures. The product is made of stainless steel without spring marbles. The lock cylinder key can ensure 1 million rotation and insertion operations. It is a safe mechanical interlocking product certified by CE.

It has been widely used in Huaneng, Datang, Huadian, Guodian and CPI power generation groups and nuclear power plants.
KAIYAN MACHINERY
Power five prevention system (FTS)

Power five prevention system is used for bus grounding maintenance

Auxiliary power 10kV / 6kV bus maintenance interlocking will form interlocking between incoming cabinet, liaison cabinet, transformer feeder cabinet and bus grounding knife

Only after the incoming cabinet, liaison cabinet and transformer feeder cabinet are disconnected, the key can be released from the exchange box to unlock the bus ground knife lock, so as to ensure the safety of maintenance personnel.

Interlocking application of electric power five prevention system in electrostatic precipitator

If you directly enter the manhole door of the electrostatic precipitator room without disconnecting the 400V power switch or grounding discharge, there will be a risk of entering the charged interval by mistake. If a set of mechanical interlocking is installed on the 400V switch, rectifier transformer ground knife and manhole door according to the normative logic, the problem of entering the charged interval by mistake in the electrostatic precipitator room can be well solved.

Description of interlocking scheme:

1. When each 400V high-frequency power switch is operated to the power-off position, the keys A1, A2, A3 and A4 in each latch lock can be pulled out, and the locking switch is in the power-off position;

2. Insert the keys Al, A2, A3 and A4 into each grounding switch to unlock the grounding knife. When operating the grounding knife to the closing position, turn all keys B on BL2 lock to lock the grounding knife in the closing position;

3. Use the keys BL, B3, B5 and 87 to open the doors of each knife switch box and start the maintenance work;

4. When it is necessary to enter the dust collector for maintenance, insert all keys 82, 84, 86 and B8 into the exchange box, exchange key C, and then open the manhole door to start maintenance.

Interlocking application of power five prevention system in insulation test

Many power plants are equipped with 6kV switchgear, including center mounted or floor mounted trolley switches (removable). The power inspection and insulation measurement after equipment maintenance and before power transmission bring many dangers and inconveniences to operators, and there are many potential safety hazards.

Description of interlocking scheme:

1. Pull the 6kV circuit breaker to the test position, rotate and pull out the key a on the pile lock, and the 6kV circuit breaker will be locked in the test position.

2. Use key a to open the door lock on the 6kV insulation measuring small door for insulation measuring operation.

3. Only when the 6kV insulation door is closed can key a be pulled out and unlocked to the 6kV circuit breaker to restore power transmission

Interlocking application of power five prevention system in maintenance of dry type transformer

When the dry-type transformer is overhauled, if the high and low voltage side switches of the dry-type transformer are not disconnected, it will be very easy to enter the live interval by mistake. This potential safety hazard can be well solved by mechanical interlocking.

Description of interlocking scheme:

1. Disconnect the 400V circuit breaker, pull it to the test position, rotate and pull out the key C1 of the mechanical lock on the 400V circuit breaker, and the 400V circuit breaker will be locked in the disconnected state.

2. Disconnect the 6kV circuit breaker, pull it to the test position, rotate and pull out the key C2 of the mechanical lock on the 6kV circuit breaker, and the 6kV circuit breaker will be locked in the disconnected state.

3. Insert the above C1 and C2 keys into the two for two key exchange box to exchange the keys C3 and C4.
應(yīng)用案例

Mechanical five proof lock

探索更多

Mechanical program lock

探索更多

Mechanical key interlock

探索更多

Safety mechanical interlock

探索更多

Mechanical anti misoperation locking

探索更多

主站蜘蛛池模板: 国产日韩视频在线观看 | 国产女人与黑人在线播放 | 97精品人妻一区二区三区麻豆 | 国产精品无码av无码国产av片 | ⅴ一区二区三区用会员 | 综合无码久久精品综合 | 欧美高清揄拍自拍视频网站 | 国产亚洲欧美日韩在线观看一区二区 | 老师洗澡让我吃她胸视频 | 青青草视频成年视频在緌观看 | 国产精品丝袜自慰在线观看 | 国产福利一区二区麻豆 | 国产精品久久精品成人网站 | 国产一区二区三区精品美女 | 亚洲国产日韩欧美在线a乱码 | 99国产午夜精品一区二区天美 | 国产一区二区三区三级无码 | 亚洲国产欧美目韩成人 | 国产精品自拍国产精品视频在 | 日本三线免费视频观看 | 国产精品视频福利一区二区 | 久久国产高清一区二区三区 | 国产精品免费视频一区二区三 | 人妻一区日韩二区国产欧美的无码 | 亚洲精品中文字幕不卡在线 | 青青草国产在现线免费观看 | 成人性生交a片免费看武则天一 | 亚洲婷婷六月 | 国产成人18黄网站在线观看 | 久久久无码精品人妻一 | 久久久久精品影院无 | 国产精品大片在线看 | 69国产品国产在线观看 | 国产精品日韩在线一区 | 国产激情久久亚洲欧美视频在线 | 自拍欧美一二区 | 日韩av无码国产精品不卡 | 大屁股国产白浆一二区 | 日韩成人精品在线 | 91精品国产综合久久久亚州日韩 | 国产福利片在线 |